29 September 2026 · 2 min read

The biggest AudioWaves production so far. Lights, sound, visuals and staging for 3000+ people at Express Avenue, Chennai, built from scratch in 24 hours.

New Year's Eve 2026 at Express Avenue, AudioWaves sound and lighting, Chennai

New Year's Eve, 31 December 2025, at Express Avenue, Chennai. A mega event for 3000+ people with Big Bang Entertainment, and the biggest AudioWaves production in our first 1.5 years. Lights, sound, visuals and staging were built from scratch in 24 hours of non-stop production.

The numbers

  • Stage: 60 × 30 × 4 ft.
  • LED wall: 700 sq ft.
  • Sound: 20 × RCF HDL 20A tops and 10 subwoofers.
  • Console: Behringer WING 48.
  • Truss: 64 × 20 ft.
  • Lighting: 20 Sharpies, 70 LED par cans, 12 blinders and 12 strobes.
  • Crowd area: 12 tents (10 × 10) and 60 barricades.

New Year's Eve 2026 at Express Avenue, Chennai

24 hours, from empty to countdown

Building a show of this size in one day comes down to planning before the trucks arrive. Every piece, from the stage deck and truss to the line arrays, LED wall and lighting, has to go up in the right order, so sound and lights can be tested before the gates open. The whole production went up from scratch in 24 hours of non-stop work.

What it proved

A night for 3000+ people is a different scale from a club night or a wedding. Delivering it in 24 hours showed what the AudioWaves team and inventory can do when the brief is big.

See the full event page with photos and the film: New Year's Eve 2026 at Express Avenue.

Questions

How big was the New Year's Eve 2026 event at Express Avenue?

A mega event for 3000+ people on 31 December 2025, with a 60 × 30 × 4 ft stage and a 700 sq ft LED wall.

How long did it take to build?

Lights, sound, visuals and staging were built from scratch in 24 hours of non-stop production.

What sound system was used?

20 × RCF HDL 20A tops and 10 subwoofers, run on a Behringer WING 48 console.

More stories